Projects

JSC ‘Power Machines’
Supply of a CNC portal milling machine SWD-58110+5F.
Supervision of installation and commissioning works; briefing of specialists on site.
Udarnaya CCGT TPP
Construction and installation works, including general construction, special construction, installation, dismantling, commissioning and other inseparably linked works related to engineering services at the facility (buildings and structures), commissioning works, equipment supply and testing.
Rooppur NPP
Supply of pipelines under lot No. 17692/695 ‘Integrated delivery of pipelines for the construction of Power Units No. 1 and No. 2 of the Rooppur NPP’, 1156 tonnes
Chernogorsk CHPP
Supply of a KV-GD-58 type boiler for the Chernogorsk CHPP
Zainsk Power Station
Supply of booster compressor station shelters for the project ‘Combined cycle gas turbine unit (CCGT) of the Zainsk Power Station, a branch of JSC Tatenergo, with a total capacity of 850 MW’
Rooppur NPP
Supply of pipelines of safety classes 3 and 4 for Power Units No. 1 and No. 2 of the Rooppur NPP, 92 tonnes
Karaganda-2 Power Station
Supply of modular construction pipelines for the project ‘Installation of a new boiler unit No. 7 of the Power Station No. 2’, 298 tonnes
Akkuyu NPP
Supply of pipe spools of the LAB and LBA systems for Power Units No. 1 and No. 2 of the Akkuyu NPP, 1237 tonnes