Projects
			Udarnaya CCGT TPP
				Construction and installation works, including general construction, special construction, installation, dismantling, commissioning and other inseparably linked works related to engineering services at the facility (buildings and structures), commissioning works, equipment supply and testing.
			Rooppur NPP
				Supply of pipelines under lot No. 17692/695 ‘Integrated delivery of pipelines for the construction of Power Units No. 1 and No. 2 of the Rooppur NPP’, 1156 tonnes
			Chernogorsk CHPP
				Supply of a KV-GD-58 type boiler for the Chernogorsk CHPP
			Zainsk Power Station
				Supply of booster compressor station shelters for the project ‘Combined cycle gas turbine unit (CCGT) of the Zainsk Power Station, a branch of JSC Tatenergo, with a total capacity of 850 MW’
			Rooppur NPP
				Supply of pipelines of safety classes 3 and 4 for Power Units No. 1 and No. 2 of the Rooppur NPP, 92 tonnes
			Karaganda-2 Power Station
				Supply of modular construction pipelines for the project ‘Installation of a new boiler unit No. 7 of the Power Station No. 2’, 298 tonnes
			Akkuyu NPP
				Supply of pipe spools of the LAB and LBA systems for Power Units No. 1 and No. 2 of the Akkuyu NPP, 1237 tonnes
			Afipsky Oil Refinery
				Supply of a hot water boiler for the Afipsky Oil Refinery